The Chemical Weapons Convention Act, 2000 · VII — MISCELLANEOUS

Section 55. Removal of difficulties

In force · As amended up to 2026-08

55. Removal of difficulties. —If any difficulty arises in giving effect to the provisions of this Act, the Central Government may, by order published in the Official Gazette, make such provisions not inconsistent with the provisions of this Act, as appear to it to be necessary or expedient for removing the difficulty: Provided that no such order shall be made after the expiry of a period of three years from the date on which this Act receives the assent of the President. 55. The inspection team shall, if it deems it necessary, transfer samples for analysis off-site at laboratories designated by the Organization. 55. In the case of an existing facility where chemical weapons destruction operations have already been initiated, the inspected State Party shall not be required to decontaminate the facility before the Technical Secretariat conducts an initial visit. The duration of the visit shall not exceed five days and the number of visiting personnel shall not exceed 15. 55. The purpose of systematic verification of the destruction of chemical weapons production facilities shall be to confirm that the facility is destroyed in accordance with the obligations under this Convention and that each item on the declared inventory is destroyed in accordance with the agreed detailed plan for destruction. 55. The observer shall have the right to arrive at the alternative or final perimeter of the inspection site, wherever the inspection team arrives first, and to have access to the inspection site as granted by the inspected State Party. The observer shall have the right to make recommendations to the inspection team, which the team shall take into account to the extent it deems appropriate. Throughout the inspection, the inspection team shall keep the observer informed about the conduct of the inspection and the findings.

Source: India Code